Slurry Separation Plant KD-100

Slurry Separation Plant KOSUN KD-100 slurry treatment system for small mud balance shield and pile foundation project is of modular structure design, which is specialized for mud purification in small slurry balance shield and pile foundation projects. The KD-100 system is equipped with combined shaker and desander. The mud flows into the desanding module after being treated by the scalping shaker. The cyclones with the diameter of 12” can remove the sand from the mud that will then be dried and discharged by a primary shaker. KD-100 Slurry Separation Plant KOSUN KD-100 Slurry Separation Technical Specification: Application; 1. Slurry supported grab works for piles and diaphragm walls 2. Deep drilling 3. Tunnelling 4. Aggregate processing 5. Mining Industry KOSUN KD series slurry separation plant; KD-100, with capacity 100m3/h; KD-250,  with capacity 250m3/h; KD-450,  with capacity 450m3/h; KD-500,  with capacity 500m3/h; Knowing more about

What is the Slurry Separation Plant for STBM

Slurry Separation Plant The Sheild TBM method is a construction method for tunneling under the ground using a shield tunnel boring machine. It would move the shield machine forward underground, to prevent the occurrence of tunnel collapse through the shield shell and supporting segment. At the same time in front of the excavation face, the cutting device is used for soil excavation, unearthed by machinery shipped outside, by Jack in the back pressure jacking, and assembling the crude concrete segment, formed a construction method of a mechanical structure of tunnel. Slurry Separation Plant Introduction; The s lurry treatment plant is for a slurry shield method,  to separate the   particle in the mud, so as to achieve the purpose of mud recycling. KOSUN Slurry Treatment Plant and Slurry Treatment System have demonstrated its high-performance capabilities at many job sites worldwide including the applications of tunneling, micro-tunneling, pipe-jacking, bored piles construc

Labels

Show more

Contact Form

Name

Email *

Message *